![pls cadd user manual wire pls cadd user manual wire](https://s3.manualzz.com/store/data/024073958_1-3a4328ff6be0ceb2478de8822d9478d2.png)
![pls cadd user manual wire pls cadd user manual wire](https://pdf4pro.com/cache/preview/d/b/e/f/8/4/f/1/thumb-dbef84f1e547a182fb9a151c4f8d892a.jpg)
#Pls cadd user manual wire portable#
Project Directory Standardization PLS-CADD Project Files – XYZ, Criteria, Feature Code, Sub Directory: Backups - Portable PLS-POLE BAK FilesSub Directory: CablesSub Directory: Data – Components, Part, SchemaSub Directory: Drafting – Title Blocks & LogosSub Directory: PhotosSub Directory: Structures – M4 M1 TapsImport Staking Table ReadmePower Line Systems, Inc.16 IKE to PLS-POLE SamplesPower Line Systems, Inc.15 IKE to PLS-POLE AutomationIKE Office API– JSON Structure Data– Photo File StorePLS API Poles: All Materials, Multi-Pole Arrangements, Push BraceArms: All PLS-POLE Arm TypesInsulators: ALL PLS-POLE Insulator TypesEquipment: PLS-POLE Equipment / FramingsGuys: Down / Span Guy Strain InsulatorsFramings: Inserted at Attachment HeightPower Line Systems, Inc.14 Power Line Reporting ApplicationPower Line Systems, Inc.13 Analysis & ReportingPower Line Reporting13.Custom XML ProcessingPower Line Systems, Inc.9 Project Directory Standardization Wire SaggingStructure AdjustmentsLoad Case Assignment12. IKE Use Case for PLS-CADD UsersDistribution System Hardening Joint Use Requests Pole ReplacementsTransmission Emergency Projects Pole Replacements As-Built Validation8
#Pls cadd user manual wire professional#
‘Point and Shoot’ Horizontal AccuracyIKE vs Professional Survey: Structure 2– Directly under power line, in Gas Station, large metal overhang––––––Base Difference: 3 inTarget Distance: 50 ftAverage Horizontal Difference:Average Vertical Difference:Horizontal Accuracy 10 ft / 50 ftVertical Accuracy 9 in / 50 ft10 ft9 in20% of Target Distance1.5% of Target Distance ‘Point and Shoot’ Horizontal AccuracyIKE vs Professional Survey: Structure 1– No overhead power line, clear open position––––Base Difference: 2 inTarget Distance: 80 ftAverage Horizontal & Vertical Difference: 4 inHorizontal & Vertical Accuracy 4 in / 80 ft 0.5% of Target Distance ‘Point and Shoot’ Vertical AccuracySag Tension ComparisonSag FitMid SpanSag (ft)Tension(lbs)Best Fit10347Best Fit /- Average Distance to Wire10 /- 0.12347 /- 3Best Fit /- Max Distance to Wire10 /- 0.33347 /- 11 %Difference15 ‘Point and Shoot’ Vertical AccuracySpan LengthTarget DistanceSample SizeAverage Distance to WireMax Distance to WireStandard DeviationAccuracy 1.38 in / 30 ft270 ft30 ft85 Points1.38 in3.96 in0.95 in0.5%Target Distance4 How Accurate Is It?Attachment Heights– 1 in on a 40 ft PoleSpans, Anchors, Poles, Wire Sag– 1% of Target DistanceIKE 4 (RTK Enabled) GPS - Structure Base, Survey Points– Horizontal Accuracy: 2-4 cm– Vertical Accuracy: 10 cmGPS– Horizontal Accuracy: 1-4 m– Vertical Accuracy: 3-12 m ‘Point and Shoot’ Survey Points– Vertical Accuracy:– Horizontal Accuracy:0.5% Target Distance0.5-20% Target Distance3 Power Line SystemsIT’S ALL ABOUT YOUR POWER LINES2019 PLS‐CADD Advanced Training and User GroupPLS-CADD & PLS-POLE Integrationwith ikeGPSbyAli KhavariPower Line 19Power Line Systems, Inc.IT’S THE SOLUTION1